UK asbestos surveys, inspections and testing Independent asbestos consultancy info@asbestosinspection.co.uk0208 088 8371

Areas we cover

The areas we cover run the length of England, Scotland and Wales, and after four decades of walking buildings I can tell you the postcode is rarely the interesting part. A Glasgow tenement, a converted Manchester mill and a Croydon office block can share a construction date and an identical materials list, and still need three different survey plans. What decides the work is the age of the fabric, what has been done to it since, and who is in it now.

  • No obligation to appoint
  • Scope matched to the planned work
  • Advice from senior consultants

Asbestos was used in UK construction until the amphibole ban in 1985 and the final chrysotile ban in 1999, so any building put up or substantially altered before 2000 is in scope until proven otherwise. That single fact does more to shape a survey than geography. The 1970s insulating board panel behind a radiator in Leeds behaves the same as the one in Exeter: friable, high fibre release when disturbed, and licensed work to remove. Asbestos cement sheeting on a Powys barn behaves the same as on a Peterborough warehouse: low risk intact, a problem the moment someone puts a drill through it.

Where location does bite is attendance. Access, occupancy, permits and travel are what turn a straightforward survey into a wasted day, and they vary enormously between a city centre tower and a farm at the end of a mile of unmade track.

London and the South East

Parking suspensions, loading windows and concierge arrangements shape the working day here more than the asbestos does. The recurring failure in converted houses and mansion blocks is scoping to the demised flat and ignoring the communal corridors, basements, lofts and shared service risers, which is exactly where the pipe lagging and the insulating board fire breaks tend to be. If the demise stops at the front door, the survey report should say so explicitly, because the management duty under CAR 2012 does not.

The Midlands

Interwar housing, post-war school building programmes and light industrial estates dominate. The system-built schools of the 1950s and 1960s are the ones worth attention: column casings, ceiling tiles, boiler house lagging and insulating board soffits, often with several generations of refurbishment on top. Textured coatings and thermoplastic floor tiles turn up constantly in the housing stock, and both are usually manageable in place rather than a crisis.

Not sure which survey your building needs?

A management survey and a refurbishment and demolition survey are different instructions with different intrusion levels under HSG264. Getting that decision right before anyone attends saves the second visit. We are an independent consultancy: survey, sampling and removal work is carried out by the vetted professionals we appoint.

Speak to a consultant

North West England

Mills and workshops here have usually been altered in four or five stages, and the drawings almost never record it. Drop a suspended ceiling in a 1980s office fit-out inside an 1890s mill and you routinely find the original sprayed coating to the steelwork sitting above the tiles, untouched and unrecorded. Boxed columns and later stud partitions hide the same thing. Assume the plans are wrong and budget for intrusive inspection where refurbishment is planned.

Yorkshire and the North East

Stone terraces and council housing at one end, engineering works and large industrial sites at the other. On the industrial estate the surveyor’s problems are height, permits and redundant plant: high-level lagging over a live production line, a boiler house nobody has entered since the plant was decommissioned, escorted access that has to be booked a fortnight out. Flag locked plant rooms and roof access before the date is set, not on the morning.

Scotland

Tenements bring an ownership problem before they bring an asbestos problem. The close, the basement stores, the roof space and the service cupboards may sit under a factor or a group of proprietors, and a survey of one flat that cannot reach any of them is of limited use to whoever holds the duty. Former industrial buildings and older hospital estates carry the heavier material: sprayed insulation, sectional pipe lagging, calorifier and boiler insulation, often still in place around redundant heating systems that were simply switched off rather than stripped.

Wales and the South West

City property and dockside buildings at one end, farms, workshops, holiday lets and isolated houses at the other. Agricultural buildings are their own category: cement roof sheets and wall cladding, often weathered, sometimes storm damaged, occasionally already broken and stacked in a corner by a well meaning tenant. A rural full postcode can cover a wide area and a locked gate with no site contact ends the visit before it starts.

Towns, villages and rural sites

Plenty of the buildings we deal with are nowhere near a named city. Village halls, single farm units, converted chapels, holiday cottages and small workshops all sit in the same pre-2000 window and carry the same materials as their urban equivalents. Distance affects scheduling rather than capability, and for islands, remote sites and jobs needing repeat visits the sensible approach is to group the work rather than pay for the journey twice.

Multi-site portfolios

Portfolios go wrong when one scope is applied to every building. A vacant warehouse awaiting demolition needs a refurbishment and demolition survey with full intrusion. The occupied office two miles away needs a management survey and a register that the facilities team can actually use. Treating them as one line item produces either an over-specified bill or a survey that will not support the demolition notification.

Set the scope building by building against construction date, present use, occupancy and any fixed works dates. That schedule is also the fastest way to spot the buildings nobody has records for, which are invariably the ones that cause trouble later.

Talk it through before anyone attends

Building age, current use, occupancy and the work you are planning are enough for us to advise on survey type, intrusion level and sequencing. Plans, photographs and access notes sharpen it further.

Speak to a consultant

Frequently asked questions

Does the age of the building decide whether a survey is needed?

Largely. The final UK ban on chrysotile came in 1999, with amphiboles banned in 1985, so pre-2000 construction is treated as suspect until sampling says otherwise. Post-2000 buildings can still contain asbestos where reclaimed materials or older plant were installed.

Which survey type applies to my building?

HSG264 sets out two: a management survey for occupied buildings in normal use, and a refurbishment and demolition survey where fabric will be disturbed. The second is intrusive and normally needs the area vacated. The planned work decides it, not the building type.

Do tenement or leasehold flats need the communal areas surveyed?

Only where the person holding the duty controls them. A survey scoped to one flat stops at the front door and covers no closes, basements, roof spaces or shared risers, which is where lagging and insulating board usually sit. Where a factor or management company controls those areas, the CAR 2012 duty for them sits with the factor, and they need their own instruction.

Is asbestos cement on a farm building urgent?

Intact sheeting weathering quietly on a barn is low risk and is often best left alone and recorded. It becomes urgent when it is broken, storm damaged, being drilled or cut, or when someone has already stacked fragments up. At that point it needs assessment before anything else happens.

Arrange the right asbestos inspection

Tell us about the property and the planned work. A senior consultant will advise on the right survey and arrange it.

Not sure which survey?
Choose survey